OpenRail DesignerCONNECT Edition

Using the Borrow Area

This site needs fill for the building pad and the optimization process is lowering the Driveways and Parking Lot to generate the fill necessary to raise the building to the desired FFE.

Using a Borrow Area allows for needed fill to be extracted from a specified location and the impact on the Driveways and Parking Lot is less.